Case Study: How a West Georgia General Contractor Eliminated Job Site Downtime With Managed IT

A regional general contractor was losing hours every week to dropped connections and an IT setup nobody fully controlled across four active job sites. Here’s how a standardized, managed approach fixed it.
Eliminating Job Site Downtime for a West Georgia Contractor

A logistics company that used to react to IT problems one at a time built a roadmap instead, and headed off three separate crises before they happened.
Case Study: Automating a Manual Downtime Log With Power Automate for a Regional Distributor

A regional distributor was tracking equipment downtime on paper and re-entering it into a spreadsheet at the end of each week. Here’s how automating that single process changed what the data was actually used for.
Case Study: Moving a 3PL Off Aging File Servers and Onto Microsoft 365 Without Downtime

A Georgia 3PL was one hardware failure away from losing years of client and shipment records. Here’s how the migration to Microsoft 365 played out.
Case Study: Closing a Compliance Gap Before It Cost a Manufacturing Client Its Biggest Contract

A prime contractor’s compliance deadline gave this manufacturer weeks, not months, to close a NIST 800-171 gap. Here’s how TekNation got them there.
Case Study: How a Local Distributor Cut Ticket Resolution Time by Switching Off Offshore Support

A Georgia distributor was losing hours a week to reopened tickets and offshore escalations. Here’s what changed after moving to a local, single-tier support model.