How TekNation Builds a Digital Order Status Board That Tells Every Supervisor Exactly Where Every Work Order Stands
By Randy Nation

Early in my career in operations leadership, I watched a shift supervisor spend 40 minutes of a two-hour production window walking the floor, calling the office, checking the ERP on a desktop computer in the corner, and physically looking at clipboards to answer one question: where is work order 4785, and why has it been sitting in material pick for six hours?
The answer was eventually found. A material shortage had stalled the order. Nobody had flagged it. Nobody had moved it. It sat, aging, while the customer waited and the shift carried on around it as if everything were fine. The order missed its ship date. The customer called. And the post-mortem meeting the next morning surfaced something that should have been visible six hours earlier.
That experience, repeated in different forms across years of value stream and operations leadership at companies like GXO and XPO, is what led me to develop a tool we called the Status at a Glance board, or SAAG. The concept is simple. The impact is not.
Every work order in your facility is somewhere. The SAAG board makes sure every supervisor knows exactly where, right now, without making a single phone call.
What the SAAG Board Is
The Status at a Glance board is a digital, real-time order status dashboard that shows every active work order in the facility, its current stage in the production workflow, how long it has been at that stage, and whether it is on track, aging, critical, or blocked by an IT or system issue. It is not a report. It is a live operational view, designed to be displayed on a screen in the production office, the supervisor’s station, or a wall-mounted monitor on the floor.
The board is organized by workflow stage, not by order number or customer name. A supervisor looking at it sees the entire production pipeline at once: what is sitting in order entry, what is in material pick, what is on the production floor, what is in QC inspection, and what is staged for shipping. Color drives immediate prioritization. Green means on track. Yellow means aging and needs attention. Red means critical, either a hold, a material shortage, a QC rejection, or an SLA at risk. Purple means an IT or system issue has blocked the order and a ticket is open.
Each order card shows the work order number, the customer, the current stage, the status, and how long the order has been in that stage. Clicking into a card opens the full order detail: the complete workflow history, the aging timeline, any exception notes, and the option to open an IT escalation ticket directly from the board if the blockage is a system problem.
Status at a Glance (SAAG) Board – Manufacturing Work Order View
| ORDER ENTRY | MATERIAL PICK | PRODUCTION | QC INSPECT | PACK & SHIP | IT / EXCEPTION |
|---|---|---|---|---|---|
|
WO-4821
Acme Corp
● On Time
|
WO-4815
TechSource
● On Time
|
WO-4809
Global Parts
● On Time
|
WO-4801
Metro Supply
● On Time
|
IT-0042
ERP Sync Error
● Ticket Open
|
|
|
WO-4798
Horizon Mfg
□ Aging 4hrs
|
WO-4794
Apex Mfg
□ Aging 6hrs
|
WO-4788
Delta Corp
□ Aging 3hrs
|
IT-0039
Label Printer Down
● In Progress
|
||
|
WO-4785
Priority Order
● Material Hold
|
WO-4779
Rush Order
● QC Reject
|
On TimeAging / At RiskCritical / HoldIT / Exception
Each card shows order number, customer, current stage, and status. Color drives instant prioritization.
Click any card to drill into order detail, aging history, or open an IT escalation ticket.
The Three Things It Enables That Nothing Else Does
In my experience running large-scale operations, the SAAG board enables three actions that traditional reporting and ERP visibility simply cannot support at the pace a production floor requires.
- Expediting with precision, not guesswork. When a customer calls to check on a priority order, the answer is on the screen in five seconds. The order is in QC inspection, has been there for two hours, and is on track to ship on time. Or it is red, it has been in material pick for eight hours, and someone needs to go free it now. Expediting without a SAAG board means hunting. With one, it means acting.
- Breaking aging orders free before they become missed commitments. An order that has been sitting in a stage longer than its standard process time turns yellow automatically. The supervisor does not need to notice it, remember it, or stumble across it on a walkthrough. It is flagged on the board the moment it crosses the aging threshold. That early warning is the difference between intervening at four hours and finding out at end of shift.
- Separating operational problems from IT problems. One of the most expensive and underappreciated sources of production delay is a system problem masquerading as an operational one. An order stalled because the ERP is not syncing, the barcode scanner is down, or the label printer is offline is not a production floor problem. It is an IT problem, and it needs an IT ticket, not a supervisor standing at the line trying to figure out why things are not moving. The SAAG board’s IT/Exception lane makes that distinction explicit and creates a direct path to resolution.
The Technology Stack Behind a Modern SAAG Board
When I was first developing the SAAG concept, it lived on a whiteboard with magnets. Later it moved to a shared spreadsheet that someone updated every two hours. Neither version worked well at scale. The modern version TekNation builds is entirely different: live data, automated status updates, and a fully interactive interface built on the Microsoft platform your operation likely already has.
- Power BI for the visual layer. The SAAG board is built as a Power BI report connected directly to your ERP, MES, or production tracking data source. Every work order record updates the board in real time or on a short scheduled refresh. The kanban-style card layout, the color coding, and the drill-through to order detail are all built within Power BI’s visualization framework, which means the board runs in any browser, on any screen, and on mobile devices without a separate application.
- Power Automate for escalation alerts. When an order crosses the aging threshold and turns yellow, Power Automate sends an automatic notification to the assigned supervisor via Microsoft Teams. When it turns red, the alert escalates to the operations manager. When an IT/Exception card is created, the ticket is automatically logged in NinjaOne, TekNation’s remote monitoring and management platform, and assigned to the appropriate technician. No manual ticket creation required.
- Microsoft Teams for in-context communication. Supervisors can action an aging order directly from the Teams notification: acknowledge, assign a countermeasure, or escalate with a comment. The activity is logged against the order record so the full history is visible on the board. Communication and action happen in the same workflow rather than in disconnected channels.
- Microsoft Fabric and Dataverse for data integration at scale. For operations running complex ERP environments or multiple data sources, Microsoft Fabric provides the data pipeline layer that consolidates order status data from disparate systems into a single model. Whether your production data comes from SAP, Oracle, a custom MES, or a combination of systems, Fabric normalizes it into the unified data model the SAAG board queries.
- NinjaOne for IT ticket management and device health. When the SAAG board surfaces an IT/Exception card, NinjaOne is the system that receives the ticket, tracks resolution, and monitors the health of the devices and systems involved. If the label printer on Line 3 is offline and it is blocking three work orders, NinjaOne shows the device status, the open ticket, and the assigned technician, all visible from the SAAG board’s IT/Exception lane.
How It Changes the Daily Production Meeting
In Part Four of this series on Short Interval Control, we described how the right data transforms the daily production meeting from a reporting session into a decision session. The SAAG board is the single most powerful tool for that transformation.
When the meeting opens, the board is on the screen. Every supervisor in the room sees the same picture: the green orders that are on track and need no discussion, the yellow orders that need a countermeasure named and an owner assigned, and the red orders that need immediate intervention. The IT/Exception lane tells the operations manager exactly which system problems are actively blocking production and where those tickets stand.
The meeting does not start with “where are we on order 4785?” It starts with “I see two red cards and three yellows. Let’s take them in order.” That is a different conversation, and it produces different outcomes.
Getting Started
The SAAG board concept is not complicated, but building it correctly requires understanding your production workflow, your data sources, and the escalation logic that fits your operation. TekNation starts with a workflow mapping session: what are the stages an order moves through, what data exists at each stage, and what should trigger a yellow, a red, and an IT/Exception flag? From there, the build is typically a matter of weeks, not months.
If your supervisors are currently finding out about stalled orders by walking the floor or waiting for someone to call, the SAAG board is the right conversation to start. We are based in Douglasville, GA and serve manufacturing businesses throughout the greater Atlanta area and beyond.